Chapter 1 - The Expulsion

The silence in the dining room was so thick it felt like a physical weight pressing against my chest.
My cheek burned fiercely where my daughter’s hand had connected with my skin.
I did not cry.
I did not scream or throw a hysterical fit.
I simply looked at Clara, whose face was already twisting from momentary shock back into defensive anger.
"Get out," I said, my voice steady and entirely devoid of emotion.
Clara scoffed, crossing her arms over her chest as if she had just swatted a fly.
"Oh, please, don't be so dramatic, Mother," she slurred, rolling her eyes.
"I said, get out of my house immediately," I repeated, taking one deliberate step forward.
My brother, Arthur, finally snapped out of his stunned paralysis.
He stood up so fast his heavy dining chair tipped backward and crashed loudly onto the hardwood floor.
"You heard your mother, Clara," Arthur growled, his face red with absolute fury.
"Grab your coat and leave this house right now before I call the police myself."
David, Clara’s husband, grabbed her arm, looking utterly terrified of the massive scene his wife had just created.
"Come on, Clara, let's just go," David muttered, desperately pulling her toward the front hallway.
She yanked her arm away, glaring viciously at every single guest sitting around my ruined holiday table.
"Fine, stay here and eat her dry, pathetic roast," Clara sneered, completely unapologetic.
"But don't come crying to me when you realize how suffocating she really is."
She stomped toward the front door, slamming it so hard the decorative glass panes rattled violently in their frames.
I stood there for a long moment, staring down at the shattered silver gravy boat on the floor.
May you like
My beautiful Christmas Eve dinner was completely destroyed, but my mind was perfectly clear.
I knew, with absolute certainty, that she would never step foot in this house again.